News

The News: 2021

MLT LLC’s Talion Arbor OSB Production Plant performed an overhaul of the main press line

January 15, 2021

In November 2020, MLT LLC’s Talion Arbor OSB Production Plant performed a scheduled overhaul of the main press line, i.e., the replacement of the press steel belt. This work and the upgrading of other pieces of equipment allowed to avoid unscheduled production downtime and resulted in increased output and improved quality of products.

MLT Ltd. constructed a standard modular timber house in Valaam Monastery farmstead, Sortavala

February 20, 2020

Over the period of February 3 – 5, 2020, MLT Ltd. constructed a 30m2 standard modular timber house in Valaam Monastery farmstead, Sortavala. MLT Ltd’s “Taleon Terra” Plant-based structural engineers design modular houses of various floor spaces (30, 60, 90, 120 m2). This house was also designed, produced and packed into a container at MLT […]

MLT Ltd fullfilled all credit obligations towards Sberbank in full scope

January 20, 2020

On January 17th 2020 Modern Lumber Technology Ltd. (OOO “STOD”) finally fullfilled all credit obligations towards Sberbank. Total amount of returned credit funds is more than 6.6 billion rubles and 31.8 million USD. “We operate in real economy sector, under real conditions. Whatever reality it is now, we always fullfilled and will be fullfilling our […]

XXVII International Festival of Architecture “Zodchestvo 2019”

October 21, 2019

PJSC “Taleon” – “Taleon Trading” took part in XXVII International Festival of Architecture “Zodchestvo 2019“, held on October 17-19, 2019, in Moscow. The XXVII International Festival of Architecture “Zodchestvo 2019” is the event of international dimension which provides the unique opportunity to get an insight into the current state of architecture and urban planning in […]

Load more